Tesla

положительный заряд автомобиля

Production and testing

beat-up-engine-free-license-cc0-980×647

По-русски

Trans Starter LTd displays to the market of the RF and CIS a new unique brand that unites in itself:

  • Best developments and quality of the original manufacturers
  • Prices of the automarket
  • Complete assistance of the sales to the wholesale customers
  • Company has 8000 starters, alternators and spare parts Multistage quality control manufacturing:

Before starting production of the new series of starters and alternators the specialists of our company carry out a large number of tests and trials strictly adhering to the specification.

Tests and trials before production:

Test for stretching, test for striking and static bending, test for determining the share of moisture, chemical analyses of the metal components, test for metal homogeneity, test of the mechanical features of metal.

  • Check of the construction rigidness in different temperature modes -40 to +50
  • Vibration test: 15G acceleration, 10 hz-1000hz during 8 hours
  • Continuous test of the alternator in the course of 1000 hours at 95 degrees Celcium
  • Test of starters: 10000 starts for passenger cars and 20000 starts for commercial vehicles
  • Secondary trials for getting world standard certificates ISO09001, TS16949, ISO14001

Products are verified uncompromisingly to ensure trouble-free operation in different condictions.

Characteristics of units and spare parts are similar to the original ones, installed on cars on the assembly line. Many products are produced in the same factories as the original spare parts and units.

Top